Customer request
‘Move email archives to the cloud. Keep the primary mailboxes here.’ In this example, Exchange runs on premises, with no hybrid deployment or directory synchronization to Microsoft 365 yet.
Technical presales automation
Way2Sol helps turn customer emails, documents and infrastructure exports into architecture options, calculations and a draft proposal, using your company’s engineering rules.
Presales leads the project. Architects focus on complex questions and design decisions.
From request to proposal
‘Add a cloud email archive.’ That one line changes the deployment, licensing and scope of work.
‘Move email archives to the cloud. Keep the primary mailboxes here.’ In this example, Exchange runs on premises, with no hybrid deployment or directory synchronization to Microsoft 365 yet.
Way2Sol maps the requirement to the changes it needs: an Exchange hybrid deployment, directory synchronization and cloud archiving rights. Server versions, access methods and customer constraints are checked.
The proposal adds hybrid configuration, directory synchronization and archive provisioning. License selection accounts for existing entitlements. Cloud storage approval and any server infrastructure changes remain open for review.
The architect receives the before-and-after design, changes to scope and cost, risks and open questions. Once approved, Way2Sol prepares the proposal with the chosen architecture, licenses and delivery plan.
How work changes
Reviewing documents, gathering requirements and running calculations take time before architecture work even begins. Way2Sol handles repetitive tasks so your team can move on to discussing the solution.
Emails, notes, documents, spreadsheets and infrastructure exports. Start with the materials your team already has.
Organizes requirements, identifies missing information and prepares questions, architecture options and calculations using company rules.
Reviews calculations, clarifies requirements with the customer and prepares the proposal for approval.
Compares options, addresses unusual constraints and approves complex design decisions.
What your team getsRequirements, architecture options, calculations and open questions stay together. When source data changes, the team can see which calculations and proposal sections need updating.
Objectives, constraints and infrastructure details gathered from correspondence, documents and technical exports.
Missing or conflicting information collected into questions your team can discuss with the customer.
Suitable options with calculations and constraints to compare, including an upgrade to the current platform.
Components, resources, licenses, risks and a delivery plan, linked to the source data used in the calculations.
Less time assembling documents and repeating calculations. More time for the customer’s requirements and the quality of the solution.
Technology packs
Each pack brings together design rules, calculations, licensing and reference architectures for its technology area. Industry practices and vendor guidance are combined with your engineers’ methods and kept as rules that apply to every new project.
Ready for a pilot
Email infrastructure: architecture, resources, archiving, licensing and migration.
Active Directory, DNS, DHCP and file services: dependencies, high availability and resource sizing.
Topology, segmentation, network and security equipment selection, placement dependencies.
Windows Server virtualization: clusters, storage, high availability and licensing.
Virtualization: clusters, resource sizing, compatibility, licensing and migration.
Virtualization: clusters, compute resources, storage and migration from other platforms.
Cloud infrastructure: service selection, role placement, resources and high availability.
Backup strategies, repositories, retention, recovery and licensing.
In progress
Database placement, resource sizing, high availability and storage requirements.
Disaster recovery: RPO/RTO targets, recovery sites, service dependencies and failover plans.
In developmentservers and storage
Example project · illustrative data
A customer wants to upgrade its virtualization platform. In this example, the team clarifies requirements, compares three options and chooses a migration approach.
The customer’s email, sales notes and infrastructure export are gathered in one project. Acceptable downtime is still unknown, so the team needs to ask the customer.
Upgrade the existing platform, move to a different one or migrate workloads in stages. The team compares resource requirements, constraints and risks for each option.
The engineer can inspect the parameters and assumptions behind each calculation. Critical systems need a separate compatibility check before the platform is selected.
The options, calculations and open questions are ready to review. The architect selects the target platform and decides how to migrate systems with special requirements.
Source data and open questions stay with the project
Reviewing calculations
Each calculation includes its inputs, sources and assumptions. The engineer can see what is confirmed, what needs clarification and which parameters require approval.
Team
Three people with an engineering background: large integration projects, banking platforms and internal enterprise tools. The calculation core and the packs are written by people who have designed and delivered such systems themselves.
Twenty years in large integration projects, from architecture to heading development. Led the development of a unified information space for a world-class international sporting event; built national-scale integrations on IBM WebSphere, Oracle and BizTalk. At Way2Sol he owns the engineering project model and the rules in the packs — what makes the calculations verifiable.
Head of analytics platform development at a major bank. Writes the calculation core: rules, data dependencies, calculations and their traceability. Owns the Databases pack.
Full-stack developer of enterprise tools. Writes the technology packs and the interface, runs the demo environments and owns testing — the regression scenarios that check system behaviour from source data to the final document.
Distributed teamLegal entity to be set up for the first pilot
A pilot with your team
We’ll help choose a completed project and agree what to compare. We’ll work from the original materials to a proposal. Your engineer can assess the calculations, architecture options and revisions needed.
Discuss the task and confirm it is a good fit for the pilot.
Use the materials your team had at the start of the project.
Review calculation quality, proposal completeness and engineering time.
Product questions
Way2Sol helps review source materials and prepare calculations and a draft proposal. The engineer checks the results and clarifies requirements. The architect chooses the technical approach and approves complex design decisions.
For an initial conversation, just tell us about your team’s work. For the pilot, we’ll choose a project together and gather its original emails, documents, spreadsheets or infrastructure exports.
Calculations retain their source parameters and references. Assumptions and missing data are marked separately so the engineer can review the result and request clarification.
Yes, where they meet the project requirements and are supported in the pilot. Upgrading the current platform may also be an option. We’ll agree the alternatives with your team.
Get in touch. We’ll discuss the proposals your team prepares, show you the product and help choose a project to evaluate. Scope, data handling and pricing are agreed before the pilot begins.
Resources
No registration required.
How Way2Sol helps your team.
Open ↗ in a new tabDownload PDFChoosing a project and evaluating the results.
Open ↗ in a new tabDownload PDFThe sections of a technical proposal.
Open ↗ in a new tabNext step
Tell us about your team’s projects. We’ll show you the product and work out where to start together.